De-aired water, pore pressure & pressure systems to BS1377 part 8 clause 3.3
This additional set of items may be required to carry out the test using the method described in BS1377 part 8
Part No | Description | Qty |
SL635 |
De-Airing Tank |
1 |
SL640 |
Vacuum Pump - 140L/min |
1 |
MH622 |
Heavy Wall Rubber Tubing H6.5 |
1 |
SL625 |
2 Regulator Air/Water Panel |
1 |
SL628 |
Bladder Air/Water Cylinder |
2 |
SL630 |
Air Compressor 1000kPa |
1 |
SL636 |
Water Distribution Panel |
1 |