CBR Soaking to BS1377 part 4/7.3

This set of equipment has been put together to list what is necessary to carry out the test using the method described in BS1377 part 4 - additional items may be required, please refer to the standard

CodeBS1377-4/7.3

Part NoDescriptionQty
SL093 CBR Mould Body 1
SL094 CBR Extension Collar 1
SL096 CBR Perforated Baseplate 1
SL098 CBR C Spanner to fit moulds and collars 2
SL099 CBR Tool 1
SL100 CBR Perforated Swell Plate 1
SL101 CBR Swell Tripod 1
MH125 Dial Gauge 25mm travel x 0.01mm - clockwise 1
SL140 Soaking Tank for CBR Moulds 1
SL103 CBR Surcharge Weight 2kg 2
MH170 Filter Paper No.1 1

Also required but not part of basic set

BS1377-4/7.2.4.2AR
Rammer compaction 2.5kg - also required